Education campus, seven school sites
Controls were fitted to separate essential from non-essential loads and schedule them across a shared campus network. Out-of-hours consumption fell from 18 to 10 kWh an hour.
Controls were fitted to separate essential from non-essential loads and schedule them across a shared campus network. Out-of-hours consumption fell from 18 to 10 kWh an hour.
Controls put out-of-hours consumption on a fixed schedule. Weekend use alone fell by 66%, from 166 to 56 kWh a day.
Lighting controls were fitted so the car park lights come on when residents are present, instead of running on a fixed timer. Weekly consumption fell from 3,875 to 2,896 kWh.
The clubhouse and machinery shed were fully electrified and a roof-mounted solar array installed, sized from a measured baseline of the site's load.
A 250 kWp rooftop solar array was installed, sized from consumption data measured before the investment was approved.
We can talk you through a comparable project and how it was measured.
Talk to usFigures are taken from completed DCS project records and checked against our own metering data at the time. Results depend on the site, its equipment and how it is operated, and do not guarantee savings on any other project.
Send us a recent bill and a short description of the site, and we will tell you where the savings are likely to be.